The following report contains a detailed account of the existing and proposed changes to Northeast High School. Existing conditions describe the current mechanical systems of the school, along with preliminary ventilation rate and energy consumption analysis'.

For the first mechanical redesign alternative, a geothermal system was proposed, with the report including the design process and calculations. The next redesign alternative described in the report are active chilled beams with a dedicated outdoor air system. Both redesign proposals include in depth cost and energy analysis'.

 

Breadth topics include an acoustical and water savings analysis. The acoustical breadth investigates the speech privacy of certain rooms within the school, using both calculated and recommended design values. Water savings was determined by analyzing the water use of domestic water in the restrooms of the school. Both breadth investigations have results and recommendations to implement positive changes within Northeast High School.

The final report is accessed by clicking the image to the right, and for an in depth summary the Executive Summary is included below.

News Feed

Fall Semester

12/7/2018

10/29/2018

10/26/2018

10/17/2018

10/1/2018

10/1/2018

9/14/2018

9/13/2018

9/10/2018

9/7/2018

9/7/2018

9/4/2018

9/4/2018

8/31/2018

8/28/2018

8/27/2018

8/27/2018

8/24/2018

8/20/2018

6/25/2018

Proposal - Posted to CPEP

Technical Report 3

Abstract - Posted to CPEP

Building Statistics Part 2- Posted to CPEP 

Building Statistics Part 1- Posted to CPEP 

Technical Report 2

Bio Sketch Peer Review and Corrections

CPEP Website - Full Function Menu

Technical Report 1

Mailed AE Dept. Thank You Letter

Sent Personal Note to Contacts

CPEP Home Page Draft

Obtained Project Documentation

Building Statistics Part 1 - Electronic Draft

Career Fair Hosting

Resume Submitted for AE Career Fair

Turned in Project Initiation Checklist Part 2

Confirmed/Corrected Master List Information

Turned in Project Initiation Checklist Part 1

Owner Permission Received

Spring Semester

4/18/2019

4/18/2019

4/1/2019

1/14/2019

CPEP Site Ready for Review

Final Presentation - Posted to CPEP

Final Report - Posted to CPEP

Revised Proposal - Posted to CPEP